
Work continues fast and furious at USN's centennial addition and renovation. With students out for Presidents Day on Monday Feb 17th, foundations for the addition were cast and the existing pool "floor" was jackhammered out. The 4th floor reconfiguration/addition work is slated to be completed by April 1 – immediately after Spring Break, with the balance of spaces likely turned over in the fall.